Lumasense-technologies M8100SM-EXP Manual do Utilizador Página 25

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 24
E
2
T QUASAR Flare Monitors Operation Manual Electrical Installation 25
4.2.4 Powering with 115 Volts AC
Note: Voltage/fusing are factory set. Use a wire gauge appropriate to service
installation. See Appendix A for Power and Fuse Requirements and Appendix E
Engineering Drawing 613-816, Service Connections.
To connect 115 VAC to Terminal TB1:
AC Hot to terminal labeled L1/HOT
AC Neutral to terminal labeled N/NEUT
AC Ground to Safety Ground stud.
4.2.5 Powering with 220/230 Volts AC
Note: Voltage/fusing are factory set. Use a wire gauge appropriate to service
installation. See Appendix A for Power and Fuse Requirements and Appendix E
Engineering Drawing 613-816, Service Connections.
North American Connection, as follows to TB1:
AC Hot1 to terminal labeled L1/HOT
AC Hot2 to terminal labeled N/NEUT
AC Ground to Safety Ground stud
European Connection, as follows to TB1:
AC L1 to terminal labeled L1/HOT
AC N to terminal labeled N/NEUT
AC Ground to Safety Ground stud
4.2.6 Powering with 24 Volts DC
Note: Voltage/fusing are factory set. Use a wire gauge appropriate to service
installation. See Appendix A for Power and Fuse Requirements and Appendix E
Engineering Drawing 613-816, Service Connections.
To connect 24VDC to Terminal TB1:
+24Vdc to terminal labeled 24VDC
24V Return to terminal labeled RTN
Ground to Safety Ground stud
Vista de página 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 77 78

Comentários a estes Manuais

Sem comentários